WALL CLADDING AND DOWNPIPE WORKS LONDON

Coverclad Services were instructed to remove and reinstate existing composite wall cladding panels to facilitate the installation of glazing to two window bays at a retail unit in London, on behalf of the main contractor.

The works were carried out over a series of visits in order to fit around other contractor works and included repositioning of existing downpipes by offsetting and tucking them neatly against the wall to the side of the new glazing sections.

Photos are below. If you require industrial roofing or cladding contractors then please contact us on 01384 573088. Alternatively you can send us a message or telephone us on 07976 726770 if you are in need of an emergency callout.

Right hand bay before work began

Before view of the right-hand bay with existing composite panels situated above the lower glazing area, and downpipe running in-front to the left.

Existing wall cladding and downpipe

View higher up of the same right-hand bay, showing how the existing composite panels and downpipe are positioned.

Top of the left hand bay

Before view showing the top of the left-hand bay, with downpipe running down the opposite right side of the bay.

Cladding removed and glazing being installed

Progress view of the left-hand bay after we removed the existing panels, flashings and downpipes, to facilitate the installation of the new upper glazing area by others.

Glazing installed and cladding reinstated

Completed view showing the top of the right-hand bay, with new upper glazing installed by others and existing composite panels with associated flashings reinstated by us. We also changed the route of the downpipe offsetting and tucking neatly against the wall.

Downpipe tucked left of the glazing

Completed view of the new upper glazing area to the right-hand bay, with existing composite panels re-fixed and downpipe tucked neatly to the left. Re-routing the downpipe both improved the aesthetic look of the bay and also allowed more light to penetrate into the unit.

Right-hand bay downpipe routed into groundworks

Completed view of the right-hand bay downpipe being re-routed so that it falls back into the original groundwork drainage.

Left-hand bay downpipe routed into groundworks

Completed view of the left-hand bay downpipe, again being re-routed into the original groundwork drainage.