ROOFING OVERCLAD AND GIROMAX GUTTER WORKS IN TIPTON

Coverclad Services was tasked to carry out an industrial roofing overclad and gutter works in Tipton, near Birmingham, directly on behalf of an estates management company. The client was taking a proactive approach and wanted a long lasting but cost effective method of protecting the roof. So rather than stripping everything down, a decision was made to overclad the existing roof with a built up system, and to install a Giromax High Performance Gutter Lining System.

Due to time constraints with a quick turn around from quote request to awarding the job and arriving on site, we overloaded the 1,750 square metre roof with between 6 and 8 personnel over a 15 working day period, to maximise efficiency and to ensure deadlines were met. The client requested for the works to be undertaken in conjunction with a 15 year insurance backed guarantee, and third party surveyors duly inspected and certified the works, ensuring manufacturer installation guidelines were met.

Photos of the roofing overclad and gutter works in Tipton are below. If you require assistance or have any questions regarding our industrial roofing and cladding services then please contact us. For emergency callouts please call 07976 726770.

Industrial unit in Tipton near Birmingham

View of the industrial unit in Tipton, near Birmingham, from ground level before the roofing overclad and gutter works began.

View of old industrial roof in need of repair

Before view along one of the two slopes showing the overall poor state of the industrial roof.

Ridge flashing showing extensive cut edge corrosion

Before view along the ridge flashing showing extensive cut edge corrosion.

Old friable rooflights and cut edge corrosion to midlaps

Before view showing old friable rooflights and substantial cut edge corrosion to the roof sheet midlaps.

Old degraded rooflights and cut edge corrosion

Closer view of the old solar degraded rooflights, corroded fixings and cut edge corrosion.

Old industrial rooflights in Tipton

Moss and grime from overhanging trees making rooflights almost undetectable.

Corroded roof fixings allowing water to ingress

Close up of old corroded roof fixings allowing water to ingress into the building.

Heavily rusted roof sheet and degraded rooflight

Old heavily rusted roof sheet and degraded rooflight in need of immediate attention.

Old temporary patch repairs to historic roof penetrations

Old temporary patch repairs to historic roof penetrations on the lower roof sheet areas (perimeter gutter in the background).

View along perimeter gutter with vegetation and debris

Before view along the perimeter gutter before our industrial gutter experts installed the Giromax HPG system. Interestingly, the gutter joints on this unit were welded instead of being overlapped and bolted / sealed together.

Valley gutter with vegetation and debris and cut edge corrosion

Before view of the valley gutter, also showing cut edge corrosion to the eaves of the roof sheets.

Perimeter gutter with vegetation and debris removed

Close up of the perimeter gutter with vegetation and debris removed, ready for our Giromax experts in Tipton to begin work.

Rusty perimeter gutter

Close up of the perimeter gutter, cleaned out ready for the rust to be removed with a wire wheeled brushed.

Valley gutter repairs in Tipton

View along the valley gutter repairs in Tipton, again ready for the rust to be removed with a wire wheeled brushed.

Industrial gutter with rust removed using wire wheeled brush

Close up of the industrial gutter, showing how the rust has been removed using the wire wheeled brush, plus Giromax Seamsil applied to the abutment details of the gutter.

Giromax Seamsil being applied by one of our Coverclad Giromax experts

Giromax Seamsil being applied by one of our Coverclad Giromax experts.

Giromax high performance gutter lining system applied to valley gutter

Mastic has been applied to the abutment details of the gutters, plus the first coat of Giromax High Performance Gutter Lining System has been applied to the valley gutter length.

Giromax expert hand brush applying final coat of Giromax HPG

Close up of one of our Giromax experts hand brush applying the second and final coat of Giromax HPG onto the upstand detail of the gutter profile.

Giromax HPG being hand rolled to valley gutter by Giromax expert

The final layer of Giromax HPG being hand rolled to the valley gutter by our Giromax experts in Tipton.

Valley gutter being water tested following installation of Giromax HPG

Valley gutter following a water test. Installation of the Giromax High Performance Gutter Lining System.

Boxed in new internal liner rooflights

Our rooflight installers replaced the existing external rooflights with Class three 2.44kg single skin rooflights, to act as the internal liner rooflight (boxing them in). Then we installed a galvanised steel grid bar system ready for rolling out the insulation and fitting the new top layer roofing sheets.

Boxed in internal liner rooflight surrounded by insulation and roof sheet

Close up view of the newly boxed in internal liner rooflight, surrounded by insulation and installed roofing sheet up to the left edge. Internal safety netting was fitted to facilitate the rooflight replacement.

Industrial roofing experts in Tipton working on roof

View of our industrial roofing experts in Tipton, rolling out insulation to each section and laying down top roofing sheets for main fixing onto the grid bars. The opposite slope is already main fixed.

Coverclad Services roofing experts working on roof

Another view of our Coverclad Services industrial roofing experts about half way along the right hand slope, laying down the roles of insulation and then the Uniclad 34/1000 profile 0.7mm plastisol coated metal roofing sheets.

Industrial roof sheets being main fixed

Closer view of the right hand slope, at the point of main fix (first fix). Some of the poppy red rooflight fixings have been fitted but the roof has not yet been fully stitched.

Newly installed external class three grp rooflights with red poppy fixings

Close up of one of the installed external Class Three 2.44kg GRP rooflights with red poppy fixings and mastic strips in place.

Ridge flashing being installed

Main fixings and side lap stitchers have been applied to both slopes. Loose insulation is filling the void and foam fillers are embedded along the flashing rail. The top ridge flashing is the last piece to be fitted.

Close up of weather flashing with correct overlap detail

Close up of the new 0.7mm plastisol coated weather flashing to the top ridge, with new fillers and associated fixings / accessories in place and the correct overlap detail.

Cold soil stack and hot flue vent fitted with new dektites and soaker flashing

Close up of the cold soil stack and hot flue vent, fitted with new dektites and soaker flashing (the existing pipes had to be extended to go through the new overclad). Roof stitchers and poppy red rooflight fixings installed in the background.

Industrial roof overclad fully stitched up

View along the completed roof, with first and second fixings complete (contrasting old neighbouring roof in the background). In the foreground the soaker flashings are tucked under the ridge flashing at the top of the slope, cascading down past the roof penetrations (just the final two top hats to be fitted onto the closest roof penetrations).

Sunset view of completed industrial roofing overclad in Tipton

Sunset view of the fully stitched up and completed industrial roofing overclad in Tipton.

Completed roofing overclad by Coverclad Services in Tipton

View along the fully installed and completed roofing overclad by Coverclad Services in Tipton.

View of roofing overclad and gutter works in Tipton with completed step up detail

Final photos of the industrial roofing overclad and gutter works in Tipton, with completed step up detail.

Roofing overclad and gutter works in Tipton

Final view from a slightly different angle.